BDC

Search

HS2 Unveils Latest Design for London Hub

WPVRZuFm

The latest designs for HS2 west London super-hub at Old Oak Common have been unveiled. Kick-starting the UK’s largest regeneration project, the new high speed station aims to transform the former railway and industrial area, into a new neighbourhood supporting up to 65,000 jobs and 25,500 new homes.

The high-speed platforms will be built below ground with connections to the adjoining ground level conventional station with an overbridge to Elizabeth line (Crossrail) trains, to Heathrow and central London. The current station design also includes the potential for provision of future services to Wales and the west of England from Old Oak Common.

The two halves of the station will be linked by a light and airy concourse with a soaring roof inspired by the site’s industrial heritage. The six 450 m HS2 platforms will be built in a 1 km long underground box, with twin tunnels taking high-speed trains east to the terminus at Euston and west to the outskirts of London.

Passengers will be taken down to the HS2 platforms by escalators, while a new public park will be built above them. Material excavated during work on the tunnels will be removed by rail from the nearby former Willesden Euroterminal depot.

The long-term planning and development of the wider site is being led by the Mayor’s Old Oak and Park Royal Development Corporation, which is planning a mixed-use development, with commercial, residential and leisure uses.

“The arrival of HS2 has the potential to transform Old Oak Common, unlocking thousands of new jobs and homes around the UK’s best connected transport hub. Linking HS2 and Crossrail, our new station will be a landmark piece of architecture at the heart of the development, designed around the passenger to ensure seamless, accessible and stress-free travel. We want the community to be a part of the design process and we are asking for their views on the latest plans,” said Matthew Botelle, HS2’s Old Oak Common Project Director.

HS2 is currently working to clear the site and prepare the ground for the start of construction, later this year.

LinkedIn
Twitter
Facebook
Pinterest
WhatsApp
Email

Latest Issue

BDC 314 : Mar 2024